Tap Water Purification Equipment
The raw wter added with flocculant is stirred and mixed by a static pipeline mixer, then enters into a "vortex-grid-folding plate" three-in-one high-efficiency flocculation tank for flocculation reaction. A series of turbidity-forming substances such as suspended solids, impurities, colloids, organic matter, and microorganisms in water are flocculated into large-sized scorpionbodies.
Then enter the pre-sinking tank for pre-precipitation, pre-precipitate the larger particles of sassafras, and prepare for the post-stage sedimentation tank to reduce the sedimentation load;
When the pre-precipitated water reaches the sedimentation zone, the sputum flower with smaller particles in the water stops, contacts and collides on the surface of the honeycomb inclined tube to form a large scorpion flower body, which is quickly released from the water by its own weight and finally sinks into the set. The mud bucket is discharged. The precipitated water enters the distribution box from the water collecting, and is evenly distributed to the multi-cell filter in parallel operation for gravity filtration. The filter layer is used to intercept the residual impurity suspended after the water is precipitated , so that the water can achieve the purpose of removing turbidity and chromaticity. And add disinfectant to make the effluent water quality meet the drinking water quality standards.
Fully automatic integrated purifier
The fully automatic integrated water purifier is mainly composed of reaction, flocculation, pre-precipitation, inclined tube sedimentation, water collecting, water distribution, filtration, automatic backwashing and mud discharging.
It is an advanced equipment that is highly efficient, energy-saving, environmentally-friendly and highly automated by our company in combination with advanced technology at home and abroad. Appraised by the relevant quality inspection and supervision department, the technologies such as processing capacity and treatment effect have reached the advanced level of similar products at home and abroad, and have been rated as high-tech products by Guangdong Science and Technology dapartment and recommended products of water resources department.
Remark:
- Filter media needs periodic replacement (normally every 1–3 years).
2. It cannot handle raw water with continuously ultra-high turbidity; pre-treatment is required in such cases.
3. As a gravity-type equipment, it has height requirements to meet the water head difference
Core Advantages
- ✓High integration and small footprint. It integrates mixing, flocculation, sedimentation, filtration, water collection & distribution, backwashing and sludge discharge into one unit. Separate construction of multiple tanks is unnecessary, which greatly reduces civil engineering work and shortens the construction period.
- ✓High treatment efficiency and stable outlet water quality. Adopting vortex-grid-fold plate composite flocculation and honeycomb inclined tube sedimentation, it can form dense flocs efficiently. The gravity filter layer further intercepts suspended solids to remove turbidity and color, and the effluent can meet drinking water standards steadily.
- ✓High automation and easy operation & maintenance. It is equipped with automatic backwashing and automatic sludge discharge functions. It can be equipped with PLC for remote monitoring. It requires less skilled operators, which is very suitable for small and medium water plants and rural water supply projects.
- ✓Energy-saving and low operating cost. The system mainly relies on gravity flow. Only a small number of lifting pumps are needed. It features low energy consumption and low chemical dosage, bringing controllable electricity and chemical costs.
- ✓Good resistance to shock load. It can keep stable operation when the raw water turbidity fluctuates temporarily, such as during rainy seasons. It is applicable to river water, spring water and other surface water sources.
- ✓Fast installation and modular design. The whole unit is prefabricated in factory. It can be put into service after hoisting, pipe connection and power connection on site. Multiple units can run in parallel for capacity expansion conveniently.
- ✓Closed operation to avoid secondary pollution. The closed structure restricts algae breeding and mosquito invasion. Sludge is collected centrally for easy discharge.
- ✓Strong adaptability. It can be matched with chemical dosing systems for flocculant and disinfectant. The electrical scheme can be customized to suit local working conditions in EastNorth asia.
Installation, After-sales & Warranty Terms
Installation Guidance
The seller provides technical installation guidance. The buyer shall be responsible for site civil work, foundation, lifting, pipeline connection, power supply, chemical dosing system piping and local auxiliary materials. The buyer shall arrange sufficient local workers and lifting tools on site for coordination. If the buyer needs our engineers to go to the site for installation and commissioning, the buyer shall bear the engineer’s round-trip airfare, accommodation, local transportation, visa fees and on-site service salary. The service period shall be agreed in advance.
Commissioning & Training
After commissioning, our technician will train the buyer’s operators on equipment operation, parameter adjustment, backwashing operation, sludge discharge, daily inspection and simple troubleshooting. We will provide operation manual, electrical drawing and spare parts list.
Warranty Period
The warranty period is 12 months starting from the date of successful commissioning and acceptance, or 18 months from the date of shipment, whichever comes first.
Warranty Scope
Within the warranty period, for failures caused by defective manufacturing and design quality of our equipment, we provide free spare parts and free remote technical support.
Excluded from warranty:
- Consumables: filter media, inclined tube fillers, sealing gaskets, valves, flow meters, dosing pumps, sensors, filter cloth etc.
- Damage caused by improper operation, wrong water pressure, wrong power supply, overloaded raw water turbidity, unauthorized modification, lack of maintenance, chemical corrosion, natural disasters and force majeure.
- Wearing parts and consumables can be supplied at factory cost price after warranty.
After-sales Service
Remote online support is available 7×24 hours via WhatsApp / Email / Video call. If on-site service is required after warranty expiration, we provide paid technical service and spare parts at favorable factory price.
Spare Parts Supply
We can supply original spare parts at any time after the warranty period. We will recommend a set of commonly used spare parts for stocking together with the main equipment.
Frequently Asked Questions
What raw water sources is this integrated water purifier suitable for?
It is suitable for river water, spring water, reservoir water and other surface water, used for tap water drinking water treatment. Not suitable for raw water with continuously ultra-high turbidity or heavily polluted industrial wastewater.
What is the standard effluent quality? Can it meet Indonesia drinking water standard?
Under qualified operation and proper dosing, the outlet water can meet drinking water standards. We can adjust the process scheme to match Indonesia’s drinking water requirements and BPOM related requirements.
What is the working principle of this equipment?
Flocculant dosing → static pipeline mixing → vortex-grid-fold plate flocculation → pre-sedimentation → honeycomb inclined tube sedimentation → gravity filtration → disinfection. It is equipped with automatic backwashing and automatic sludge discharge.
Is the equipment gravity type or pressure type? Does it need many pumps?
It is gravity-type equipment. It relies on water head difference for flow. Only intake pump and clean water delivery pump are generally required. It has low energy consumption. Note: installation height difference is required
Can the equipment run automatically? How much manpower is needed?
Fully automatic operation with automatic backwashing and automatic sludge discharge. It can be equipped with PLC control. Normally only one operator is needed for daily inspection and regular chemical dosing.
How long is the warranty period?
12 months from commissioning acceptance, or 18 months from shipment date, whichever comes first. Consumables are not covered by warranty.
What are the consumable parts? How often do they need replacement?
Filter media, honeycomb inclined tube, gaskets, dosing pump, sensors, valves etc. Filter media replacement cycle is about 1–3 years according to raw water quality.
Do you provide installation service?
We provide remote technical guidance for free. If you need our engineers to go to your site for installation and commissioning, buyer shall bear engineer’s air ticket, accommodation, transportation, visa and service fee.
Can multiple units be connected in parallel to expand capacity later?
Yes. This is modular design. Customers can add more units in parallel when water demand increases.
What site preparation work does the buyer need to do?
Civil foundation, equipment platform, water head difference layout, power supply, pipeline, lifting tools, on-site workers and auxiliary materials.
What is the delivery cycle?
Normally 20–35 working days after receiving deposit. Exact lead time depends on model and configuration.
Can you supply spare parts after warranty?
Yes. We supply original spare parts all the time at factory price. We also suggest a spare parts package together with main equipment
Lines That Include This Equipment
Send Your Requirements
- Required treatment capacity: — ____ m³/h or ____ m³/day
- Raw water source: □ River water □ Spring water □ Reservoir water □ Others —
- Raw water turbidity (NTU): average value and maximum turbidity during rainy season —
- Required outlet water standard: □ drinking water standard (BPOM) □ Other standard —
- Local power supply: voltage & frequency (e.g. 380V 50Hz / 220V 50Hz) —
- Site condition:Is civil foundation ready or we need to provide foundation drawing? —
- Automatic configuration: Do you need PLC control + remote monitoring? —
- Additive system: Do you need flocculant dosing unit and disinfection unit (chlorine / UV)? —
- Delivery destination: City / Port —
- Payment term expectation and required delivery time —